Skip to main content
GermanyEngineeringIndustry partnersEnergy plant operators

BEW transformation plan and engineering

Large-scale 20 MWth heat pump for Erlanger Stadtwerke AG

Iqony Solutions is compiling a transformation study and is also designing a new large-scale heat pump based on river water.

Project details:

  • Transformation study according to BEW (Federal Funding for Efficient Heating Networks) requirements
  • River water source heat pump rated at 20 MWth
  • CAPEX > 20,000,000 euros
  • River water connection, district heating connections
  • New build, greenfield site

 

Iqony's decarbonisation studies for your company

Project facts

Technical data
  • Inner-city district heating network
  • 20 MWth heat pump
  • Maximum load approx. 120 MWth
Type of studyBEW study to AGFW requirements, district heating network
Voltage levelMedium voltage
HOAI phasesPreliminary design for heat pump
ClientErlanger Stadtwerke AG
IQS performance period10/2023 to 03/2024
Base