Construction of solar park

Tabernas II, Spain

As the third out of four solar farms of the Tinosa Pipeline, the solar farms Tabernas II went on line in 2022. With a capacity of 50 MWp, the plant in the Spanish Tabernas desert ensures an annual electricity generation of 100,000 MWh, which is fed into the local grid via the substation “La Serrata” constructed by SENS.

The two solar farms La Cabrita (50 MWp) and EGA (30 MWp) were completed earlier. Thus 130 MWp out of the projected 180 MWp pipeline have been connected to the grid.

 

SENS - Iqony Sustainable Energy Solutions | Solar projects worldwide

#Solar

Project facts

LocationTabernas Desert
CountrySpain
Overall capacity50 MWp
Year2022
2022 Commissioning
50 MWp Overall capacity
100,000 MWh Annual electricity generation